Tesla begins construction of world’s largest energy storage facility

FORBES | Tesla TSLA and PG&E recently broke ground on a record-setting energy storage system in Moss Landing (Monterey) California that, once complete, will be the largest such installation in the world. The battery park will be able to dispatch up to 730 megawatt hours (MWh) of energy to the electrical grid at a maximum rate of 182.5 MW for up to four hours using 256 of Tesla’s lithium-ion (Li-ion) Megapacks. Tesla and PG&E will have the option to upgrade Moss Landing’s capacity to bring the system up to 1.2-gigawatt-hours which could, according to Tesla, power every home in San Francisco for six hours.


The facility is expected to come online in 2021 and will be designed, constructed, and maintained by both companies, with PG&E retaining ownership. The construction of the Moss Landing site and other such mega-storage projects around the world portends a massive shift away from hydrocarbon-based power systems towards renewable generation backed up by utility-scale storage.  According to Fong Wan, a senior vice president at PG&E:


To read the full article, click here.





  • LinkedIn
  • Twitter

© 2020 Energen. This website represents a proof of concept of the future platform