SMART ENERGY INTERNATIONAL | Siemens and Berkeley have signed an agreement for the provision of an energy management system, Siemens Gamesa’s Hybrid Plant Controller.
The platform will be used to integrate and ensure real-time control of existing 16 MW wind energy facility and a 6 MW battery energy storage system. The 16 MW system has 8 Siemens Gamesa 2 MW turbines and has been developed since 2007.
To read the full article, click here.
