Emperor teams with APA on Judith offshore gas project

OFFSHORE ENERGY | Emperor Energy and Australia’s largest gas infrastructure company APA Group have entered into a binding agreement to progress with the pre-front end engineering design (pre-FEED) for the provision of midstream infrastructure and services related to potentially produced gas from the Judith offshore gas field.


The Judith field is located in Emperor Energy’s 100 per cent owned VIC/P47 permit in the offshore Gippsland Basin.


Emperor said on Tuesday that the pre-FEED study would consist of several tasks, one of them is a design for a gas processing plant which would operate adjacent to and in parallel with the existing Orbost Gas Processing Plant owned by APA.


To read the full article, click here.



  • LinkedIn
  • Twitter

© 2020 Energen. This website represents a proof of concept of the future platform