DRC copper project advances with Covid-19-influcned prefeasibility study

With a prefeasibility study (PFS) already under way, Central Copper Resources has started to develop its first mining project − the Mbamba Kilenda (MK) copper project − in a new copper province in the Democratic Republic of Congo (DRC).


The MK project is located on the western side of the DRC, within 70 km of Kinshasa, and sits on the West Copper Belt which extends over 1 400 km from Angola, through the DRC, and Congo-Brazzaville to Gabon.


To read the full article, click here.



  • LinkedIn
  • Twitter

© 2020 Energen. This website represents a proof of concept of the future platform